About this project |
A 15,000 SF addition to existing Gravity Belt Thickeners Building located at Back River wastewater treatment plant, Baltimore, Maryland. Addition includes 7,000 SF Mechanical room and a two APR structures. The facility was designed with one new APR tanks with aluminum metal panels to match existing egg digester. An access was provided to the top of the facility through staircase and elevator shaft designed considering overall massing and aesthetics of the facility. Architectural vocabulary of existing building is adopted in new design to provide aesthetically uniform appearance.
Client | Baltimore City, DPW
Location | Baltimore, MD